Print Email Facebook Twitter Modelling and simulating time use of site workers with 4D BIM Title Modelling and simulating time use of site workers with 4D BIM Author Vrijhoef, R. (TU Delft Design & Construction Management; Hogeschool Utrecht) Dijkstra, Jan Tjerk (Student TU Delft) Koutamanis, A. (TU Delft Design & Construction Management) Contributor Gonzalez, Vicente (editor) Date 2018 Abstract This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result. Subject BIMtime usesimulationsite worklabour optimisation To reference this document use: http://resolver.tudelft.nl/uuid:466fe871-521a-4e5e-a4e4-ade348a33d87 DOI https://doi.org/10.24928/2018/0536 Publisher IGLC (International Group for Lean Construction) Source Proceedings of the 26th Annual Conference of the International Group for Lean Construction (IGLC 2018) Event IGLC 2018: 26th Annual Conference of the International Group for Lean Construction, 2018-07-16 → 2018-07-20, Chennai, India Part of collection Institutional Repository Document type conference paper Rights © 2018 R. Vrijhoef, Jan Tjerk Dijkstra, A. Koutamanis Files PDF Vrijhoef_et_al._2018_Mode ... 4d_BIM.pdf 653.16 KB Close viewer /islandora/object/uuid:466fe871-521a-4e5e-a4e4-ade348a33d87/datastream/OBJ/view