Print Email Facebook Twitter An application of construction logistics analysis: The case of the new Delft train station and City Hall Title An application of construction logistics analysis: The case of the new Delft train station and City Hall Author Papaprokopiou, D. Contributor Ludema, M.W. (mentor) Faculty Technology, Policy and Management Department Management of Technology Date 2010-11-26 Abstract Investigation of the construction logistics processes during the design phase of the construction of the new Delft City Hall, part of the Spoorzone project. The main goal of the research is to investigate how construction logistics analysis during the design phase can enhance the project efficiency while at the same time minimizing local external effects such as the distortion of the life of local citizens, traffic congestion, etc. The research is conducted with the support of Ontwikkelingsbedrijf Spoorzone Delft B.V., suggestions provided related with the development of a logistics plan for the construction site. Subject building constructionlogistics managementconstruction logistics To reference this document use: http://resolver.tudelft.nl/uuid:8725e803-9ae6-43a3-b356-940caac1b924 Part of collection Student theses Document type master thesis Rights (c) 2010 Papaprokopiou, D. Files PDF An_application_of_constru ... kopiou.pdf 6.51 MB Close viewer /islandora/object/uuid:8725e803-9ae6-43a3-b356-940caac1b924/datastream/OBJ/view