Print Email Facebook Twitter Cost of quay walls including life cycle aspects Title Cost of quay walls including life cycle aspects Author De Gijt, J.G. Vinks, R. Faculty Civil Engineering and Geosciences Department Hydraulic Engineering Date 2011-12-31 Abstract Port authories and other organisations involved in designing and building of port infrastructure are at first glance interested in predicting adequatly the expected costs. This paper discusses the costs development of quay walls versus time. The basis for the costs development of quay walls is discussed on the basis of two methods. The MTI method and MII method. These methods are compared and discussed. Further a database with the construction costs of approximately three hundred quay walls from between 1850 to 2008 enables the composition of relations of the construction costs for several countries and port cities. In addition also relations are developed for different types of quay walls. With the developed model predictions can be made for the costs of quay walls in the future under the assumptions of certain boundary conditions. In addition to the initial costs also the the overall costs are including the effects of lifecycle concepts. Finally some conclusions and recommendations for the application of the developed model are presented and for further research Subject quay wall, costs , life cycle , port, indexing To reference this document use: http://resolver.tudelft.nl/uuid:cbac3e3f-a9c3-486a-862f-cecf0ebc036e DOI doi:10.3850/978-981-08-7617-3 114 Publisher MTEC ISBN 978-981-08-7617-3 Source Proceedings of the International Maritime-Port Technology and Development Conference, MTEC2011, April, Singapore Part of collection Institutional Repository Document type conference paper Rights (c) 2011 De Gijt, J.G., Vinks, R. Files PDF 278136.pdf 215.48 KB Close viewer /islandora/object/uuid:cbac3e3f-a9c3-486a-862f-cecf0ebc036e/datastream/OBJ/view